Old Main Under Construction
Exterior
Renovations to the stucco and french drains
were done between 1999 and 2001.
Cost: $600,000
Central Campus HVAC
Loop System
The creation of a new central campus heating,
ventilation and air conditioning system looping
Main Building, Shipp Hall and DuPré Hall
was completed in 2001.
Cost: $1.2 million |
 |
West Wing
Renovation was done from April 2005 to
February 2006 on the West Wing classrooms
and faculty offices. Accessibility includes an
elevator with ground level access in this wing. Also completed during this phase was the renovation of Mickel Chapel.
Cost: $1.7 million
|
Leonard Auditorium
The auditorium has state-of-the-art sound, AV movie screen, lights and
controls. Renovations were completed
during the summer of 2006.
Cost: $3.2 million |
 |
East Wing Renovation was done from
February 2005 to November 2006
on East Wing faculty offices
and classrooms.
Cost: $2.2 million |